|

[featured_image]
  • Version
  • Download 188
  • File Size 799.23 KB
  • File Count 2
  • Create Date 30 January 2025
  • Last Updated 30 January 2025

PANEL OF NOT MORE THAN FIVE (05) CONTRACTORS FOR THE ELECTRICAL REPAIRS ON BOREHOLES, WATER PUMP STATIONS, WATER TREATMENT PLANT AND INSTALLATION OF MV & LV TRANSFORMERS ON AN AS WHEN REQUIRED BASIS FOR A PERIOD OF THREE (03) YEARS. CLOSING DATE: 03 MARCH 2025 @ 11H00AM

Attached Files

FileAction
PANEL OF NOT MORE THAN FIVE (05) CONTRACTORS FOR THE ELECTRICAL REPAIRS ON BOREHOLES, WATER PUMP STATIONS, WATER TREATMENT PLANT AND INSTALLATION OF MV & LV TRANSFORMERS ON AN AS WHEN REQUIRED BASIS FOR A PERIOD OF THREE (03) YEARS. CLOSING DATE: 03 MARCH 2025 @ 11H00AMDownload
GCC.pdfDownload

Comments are closed.